- Prepare as-built drawings from measuring existing home (or from existing plans, if available)
- Place as-built drawing with reference to existing property lines
- Prepare existing exterior elevations from measurements and photographs
Presentation of the preliminary design documents requires:
- Proposed floorplan changes relative to as-built drawings (options as relevant)
- Proposed exterior elevation changes relative to the as-built drawings (options as relevant)
- Preliminary Scope of Work
- Preliminary budget considerations
Approval of the content of this meeting moves to the next step in the process. Changes requested as a result of the presentation requires a follow-up meeting for preliminary design.
<< Previous Step | Next Step>>

